Tất cả sản phẩm
-
GuillermoExcellent! Fast delivery! I like to work with you again!
-
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us.
-
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration.
-
SjakThat's true we enjoy doing business with you.
-
Kelly MarshLiFong is one of our desired vendors in China
-
Raimund SchenkChất lượng sản phẩm, giá cả cạnh tranh, luôn là một trong những nhà cung cấp chính của chúng tôi
Người liên hệ :
Carl Peng
Số điện thoại :
86-13925550965
Whatsapp :
+8613925550965
Kewords [ die cast parts ] trận đấu 611 các sản phẩm.
Spraying Aluminum Die Casting Car Lighting Part With 0.5mm Tolerance
Packaging Details: | Standard Packing Or Customized |
---|---|
Delivery Time: | 15-30days |
Payment Terms: | T/T, D/P, L/C, Western Union |
Temper T3 - T8 Aluminium Die Casting Cold Drawn Engineering Machinery Parts
Packaging Details: | Standard Packing |
---|---|
Delivery Time: | MOQ 1 Week, 50,000pcs 4 Weeks. |
Payment Terms: | TT, L/C |
Waterproof High Pressure Die Casting LED Bulb Housing With Electrostatic Spraying
Material: | Aluminum alloy,Stainless steel |
---|---|
Craft: | Die castings |
Aplication: | LED light housing |
Aluminum LED Housing Precision High Power Aluminium Die Casting Process
shape: | Square |
---|---|
material: | Aluminum |
grade: | 6000series |
Gia công CNC nhôm đúc OEM / ODM với kiểm tra 100%
Quá trình: | Cơ khí CNC |
---|---|
kỹ thuật chế biến: | Chế tạo dụng cụ đúc khuôn--Nguyên mẫu/ T1--Kiểm tra kích thước-- Phê duyệt mẫu-- SOP |
thời gian dẫn: | 7-15 ngày |
Nhà máy nhôm đúc nhôm đúc ngoài trời
Packaging Details: | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
---|---|
Delivery Time: | MOQ 2 Weeks, 10,000pcs+ : 4 Weeks. |
Payment Terms: | TT, L/C |
Electrostatic Spraying Aluminium Die Castings , 100W Aluminum Led Housing For Tunnel ASTM B 85-03
Packaging Details: | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
---|---|
Delivery Time: | MOQ 2 Weeks, 10,000pcs+ : 4 Weeks. |
Payment Terms: | TT, L/C, D/P, Western Union |
Powder Coating Aluminium Die Castings , Trunk Road Aluminum Led Lamp Housing
Packaging Details: | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
---|---|
Delivery Time: | MOQ 2 Weeks, 5,000pcs+ : 4 Weeks. |
Payment Terms: | TT, L/C |
Corrosion Resistant Aluminium Die Castings , A380 Aluminum Garden Led Light Housing
Packaging Details: | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
---|---|
Delivery Time: | MOQ 2 Weeks, 10,000pcs+ : 4 Weeks. |
Payment Terms: | TT, L/C, D/P, Western Union |
ASTM B 85 Aluminium Die Castings Led Street Light Housing With Electrostatic Spraying
Material: | A380 (Standard: ASTM B 85-03 Standard ) |
---|---|
Overall Dimension: | L740*W340*H165mm |
Installation Tube Diameter: | 61mm |